Inner Corner at Base of Wall Arlington VA

The concrete masonry can be connected to the corner column with a debonded shear anchor. This type of anchor resists out-of-plane (but not in-plane) shear forces and permits movement between the steel column and concrete masonry.

Winston'S Of Northern Virginia
(703) 379-5006
2701 S Oakland St Ste C
Arlington, VA
 
Dawson'S Brickwork
(703) 528-6787
1324 N Stuart St
Arlington, VA
 
Manganaro Mid Atlantic
(703) 243-0026
1301 N Troy St
Arlington, VA
 
A Step In Time Chimney Cleaners & Repair Is 800-Fireman
(703) 237-4545
6700 Lee Hwy
Arlington, VA
 
Jeff L. Cadle Masonry
(703) 698-1390
2811 W.Glen Drive
Falls Church, VA
Services
We specialize in masonry repairs including brick and stone as well as mortar matching. We also specialize in chimney repairs and all other types of masonry repairs.

Williams John T Assoc Inc
(703) 892-2929
1611 S Walter Reed Dr Ste 102
Arlington, VA
 
Winston'S Air Duct Cleaning Inc
(703) 379-5006
4800 King St
Arlington, VA
 
O Reilly Masonry
(703) 841-7233
5201 5th St N
Arlington, VA
 
Boyd D L
(703) 241-2060
6700 Lee Hwy
Arlington, VA
 
Leon's Masonry Services
(877) 259-0642
8104 Carrick Lane
Springfield, VA
 

Inner Corner at Base of Wall

Provided By:

Source: MASONRY CONSTRUCTION MAGAZINE
Publication date: September 1, 2006

By Walter A. Laska

It is difficult for a mason to properly tool mortar joints at inner wall corners due to the size and shape of the jointer and the acute angle formed by the intersecting brick. As a result, the mortar joints at this location cannot be tooled neatly or compactly. Therefore, inner wall corners provide an ideal location for expansion joints.

Expansion joints located at inner corners are easy to construct and are well concealed. The expansion joint should be totally void of any material which might inhibit movement, and the reinforcement must be discontinuous at the expansion joint.

The concrete masonry can be connected to the corner column with a debonded shear anchor. This type of anchor resists out-of-plane (but not in-plane) shear forces and permits movement between the steel column and concrete masonry. Also, the connection creates a control joint in the concrete masonry backing along the column interface.
Elevation View

The space between the column and the concrete masonry should be kept free of all mortar bridging. If the column and concrete masonry are tightly bonded, any movement of the column is transferred to the masonry, possibly causing the concrete masonry backing to crack.

Flashing continuity must be maintained at the inner corners. The flashing should be cut, lapped, and set in a continuous bed of mastic to prevent water from flowing under the laps.

Click here to read full article from Masonry Construction